Por favor, use este identificador para citar o enlazar este ítem: https://repositorio.uta.edu.ec/jspui/handle/123456789/23840
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorBalarezo López, Julio Enrique-
dc.contributor.authorLascano Sumbana, Klever Vinicio-
dc.date.accessioned2016-10-13T13:32:19Z-
dc.date.available2016-10-13T13:32:19Z-
dc.date.issued2016-
dc.identifier.othert1165mbd-
dc.identifier.urihttp://repositorio.uta.edu.ec/jspui/handle/123456789/23840-
dc.description.abstractEl agua potable y su distribución es uno de los ejes de la vida humana por lo que se estableció las políticas en Ecuador a través del “Plan del Buen Vivir” con el fin de la universalización del servicio garantizando los derechos de los Ecuatorianos. En la actualidad el servicio de agua potable es brindado por alrededor de 76 empresas públicas que cubren las zonas urbanas y alrededor de 5000 Juntas Administradoras de Agua Potable para las zonas rurales. La presente investigación “Diseño de un Modelo para Determinar la Demanda se Agua Potable para Juntas de Agua Potable de la Provincia de Tungurahua: Caso de Aplicación Parroquia Huambalo”, establece un modelo para determinar la demanda de agua potable para la zona analizando uno de los recursos más valiosos de las Juntas de Agua Potable recolectadas como los históricos de consumo y recaudación con aplicación de técnicas de data cleanning, data profiling, ETL y data warehouse, lo que viabiliza la implementación de la solución informática y un modelo de aplicación de la información histórica que permitan establecer planes de desarrollo y mantenimiento de las fuentes de agua potable de Huambalo y la dotación a la población, sustentada en base a la aplicación de la entrevista, y técnicas de recolección de datos con el propósito identificar las necesidades de la entidad. En el análisis se relacionaron las variables, el marco teórico y los objetivos, llegando a las conclusiones y recomendaciones congruentes. La inversión en la recolección, transformación y análisis de la información histórica de las Juntas de Agua potable es mínimo en relación a estudios de empresas públicas con el uso de la presente solución, lo cual contrasta con los escasos recursos económicos de los que disponen los interesados. Como conclusión lógica de la presente investigación se determina que la demanda de agua potable en la fuente abastecedora de la zona de Huambalo actualmente es Alta (superior al 40%) y cuyo índice de escasez llegara a su nivel crítico en el año 2025 con el 100.89%. EXECUTIVE SUMMARY Drinking water and its distribution is one of the pillars of human life so Ecuadorian policies are established through the “Plan del Buen Vivir” for the purpose of universal service guaranteeing the Ecuadorians rights. At present, the water service is provided by around 76 public companies covering urban areas and around 5000 Drinking Water Administration Boards for rural areas. This research "Designing a Model for Determining Drinking Water Demand for Drinking Water Administration Boards of Tungurahua Province: Case of study Huambalo" provides a model to determine the demand for drinking water for the area by analyzing one of the most valuable resources of the Boards of Water collected as historical consumption and collection with application techniques as data cleanning, data profiling, ETL and data warehouse, which makes possible the implementation of the iT solution and a model of application of information historical that establish development plans and maintaining sources of drinking water of Huambalo and provision to the population, based on the application of the interview, and techniques of data collection in order to identify the needs of the entity. In analyzing the variables, the theoretical framework and objectives were related, reaching conclusions and recommendations consistent. Investment in the collection, processing and analysis of historical information of the Boards of drinking water is minimal in relation to studies of public enterprises with the use of this solution, which contrasts with the limited financial resources available to stakeholders. As a logical conclusion of this investigation it is determined that the demand for drinking water in the upstream source area Huambalo currently is high (above 40%) and whose scarcity index reached its critical level in 2025 with 100.89 %.es_ES
dc.language.isospaes_ES
dc.publisherUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Dirección de Posgrado. Maestría en Gestión de Bases de Datoses_ES
dc.rightsopenAccesses_ES
dc.subjectDATA WAREHOUSEes_ES
dc.subjectAGUA POTABLEes_ES
dc.subjectETLes_ES
dc.subjectHUAMBALO - ECUADORes_ES
dc.titleDiseño de un modelo para determinar la demanda de agua potable para juntas de agua potable de la Provincia de Tungurahua: caso de aplicación parroquia Huambaloes_ES
dc.typemasterThesises_ES
Aparece en las colecciones: Maestría en Gestión de Bases de Datos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Tesis_t1165mbd.pdf6,59 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.