Por favor, use este identificador para citar o enlazar este ítem: https://repositorio.uta.edu.ec/jspui/handle/123456789/39625
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorGuamanquispe Toasa, Jorge Patricio-
dc.contributor.authorEscobar Vallecilla, Erick Enrique-
dc.date.accessioned2023-09-08T22:57:50Z-
dc.date.available2023-09-08T22:57:50Z-
dc.date.issued2023-09-
dc.identifier.urihttps://repositorio.uta.edu.ec/jspui/handle/123456789/39625-
dc.descriptionEl presente proyecto técnico se lo realizó con el propósito de implementar un plan de mantenimiento preventivo, para el taller Industrial “Jackson”, basado en la gestión de activos, por lo que actualmente no cuentan con uno, también se procura garantizar apoyo a los activos del taller por lo que se empleó la norma ISO 55000. En el desarrollo, se realizó la codificación de las máquinas para identificar de forma rápida y sencilla; se realizaron las fichas técnicas y un estudio sobre la situación actual de los mantenimientos, dichos datos se representaron en los estadísticos y análisis de la curva de la bañera de las máquinas, donde nos indica en que etapa se encuentran las máquinas. Luego, se ejecutó un análisis modal de fallas y efectos (AMFE) con los parámetros establecidos en la nota técnica NTP 679, donde se detallaron los componentes más críticos a sufrir averías y que pueda provocar un paro inesperado de las máquinas, con la finalidad de conocer la falla funcional, las causas de fallas y efectos; se realizó un análisis de criticidad de los equipos, para determinar los componentes más críticos de cada máquina. Finalmente, se desarrolló el plan de mantenimiento preventivo, empleando un software tecnológico libre gratuito “Microsoft Excel”, donde se detallaron las bitácoras de mantenimiento de cada máquina, la generación del reporte mensual y datos; se puede guardar e imprimir cada uno de los reportes generados, con la finalidad de manejar de una forma más rápida y sencilla la información, con relación a los activos del taller.es_ES
dc.description.abstractThis technical project was carried out with the purpose of implementing a preventive maintenance plan for the "Jackson" industrial workshop, based on asset management, as they do not currently have one, and also to guarantee support for the workshop's assets, which is why ISO 55000 was used. In the development, the coding of the machines was carried out in order to identify them quickly and easily; technical data sheets and a study of the current maintenance situation were made, this data was represented in the statistics and analysis of the curve of the machines' bathtub, which indicates the stage the machines are in. Then, a modal analysis of failures and effects (FMEA) was carried out with the parameters established in the technical note NTP 679, where the most critical components to suffer breakdowns and that can cause an unexpected stoppage of the machines were detailed, in order to know the functional failure, the causes of failures and effects; a criticality analysis of the equipment was carried out, in order to determine the most critical components of each machine. Finally, the preventive maintenance plan was developed, using a free technological software "Microsoft Excel", where the maintenance logs of each machine were detailed, the generation of the monthly report and data; it is possible to save and print each of the generated reports, in order to manage in a faster and simpler way.es_ES
dc.language.isospaes_ES
dc.publisherUniversidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánicaes_ES
dc.rightsopenAccesses_ES
dc.subjectNTP:679es_ES
dc.subjectMANTENIMIENTO PREVENTIVOes_ES
dc.subjectNORMA ISO 55000es_ES
dc.subjectPLAN DE MANTENIMIENTOes_ES
dc.subjectGESTIÓN DE ACTIVOSes_ES
dc.subjectAMFEes_ES
dc.titleDesarrollo de un plan de mantenimiento preventivo basado en la gestión de activos, empleando la norma ISO 55000 para el taller industrial Jackson en la ciudad de Esmeraldases_ES
dc.typebachelorThesises_ES
Aparece en las colecciones: Ingeniería Mecánica

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Tesis I.M. 785 - Escobar Vallecilla Erick Enrique.pdfTESIS A TEXTO COMPLETO3,98 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.