Ingeniería Civil y Mecánica
Permanent URI for this communityhttp://repositorio.uta.edu.ec/handle/123456789/898
Browse
1 results
Search Results
Item Diseño del sistema de alcantarillado y planta de tratamiento de aguas residuales de la comunidad Quiambe, cantón Quero, provincia de Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2025-02) Torres Paredes, Kevin Fernando; Cañizares Proaño, Byron GenaroCurrently, developing areas in Ecuador lack sewerage, as only 50.7 percent of Municipal GADs have this service, and this is even more noticeable in rural communities, such as Quiambe, which do not have basic sanitation infrastructure. Therefore, the objective of this technical project is to carry out the design of sanitary sewerage for the area, also including the design of a treatment plant, which guarantees the correct management and disposal of treated water, thus improving the quality of life of its inhabitants and the environmental surroundings. To carry out this objective, first the topographic survey was carried out using an RTK, then the characteristics of the area were obtained through surveys of the population, and the water supply of the sector was also determined by taking readings from 10 homes in the area. Then, the sewerage system design was carried out based on the Bolivian standard NB 688 and the treatment plant using the guidelines for the design of septic tanks, IMHOFF and stabilization ponds, design of municipal wastewater treatment plants: up flow anaerobic filters and the INEN 005-9-1 standard, and as a last point a budget was made that this project will have with its respective items, technical specifications and a schedule of activities to be carried out. Finally, it was found that the sanitary sewer system consists of a network of 3093.73m, 62 wells, 62 pipes that vary from 200 mm in diameter, while for the treatment of wastewater it has a pretreatment, primary and secondary treatment and sludge drying, complying with the established parameters, it should be noted that the cost of the project has a value of 346,798.57 dollars and has a term of 6 months.