Ingeniería Civil y Mecánica

Permanent URI for this communityhttp://repositorio.uta.edu.ec/handle/123456789/898

Browse

Search Results

Now showing 1 - 10 of 19
  • Item
    Diseño sostenible de un sistema hidrosanitario de una casa unifamiliar en el cantón Ambato, provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2022-06) Maldonado Andrade, Jennifer Gabriela; Frías Torres, Alex Xavier
    In Ecuador, the requirement for drinking water in homes has increased over the years and with it the production of wastewater. Excessive consumption and lack of water treatment is a problem that affects the health of people and the environment, so it is vitally important to seek methods that focus on the sustainable consumption of this resource. The following methodology was used for the project: documentary, field and experimental, with a quantitative orientation for hydraulic calculation. The technical work focuses on the design of a hydro-sanitary system that reduces domestic consumption of drinking water from the public network, through the collection of rainwater and the reuse of gray water from showers and sinks. For which the design divided the conventional drainage system, leading the gray water to a treatment system made up of: a reception tank, a grease trap and a commercial filter; in order to be able to use the treated gray water in domestic activities that do not require direct contact with users and do not pose a risk to them.
  • Item
    Diseño de la red de distribución principal de agua potable para la parroquia Pasa del cantón Ambato, provincia de Tungurahua-Ecuador
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Carrera de Ingeniería Civil, 2018) Caguana Fonseca, Vladimir Patricio; Guevara Robalino, Jorge Javier
    The technical project is a contribution to the improvement of the quality of life of the inhabitants of the parish of Pasa with the purpose of designing the main distribution network for water supply to the center of the community. It began collecting statistical data and that were provided by the Decentralized Autonomous Government of the Rural Parish of Pasa where you can identify the number of beneficiary inhabitants that currently exist, their social and economic situation, after this, the ground was lifted using precision equipment, in this case, the Trimble total station. Already in office work, we proceeded to the most optimal layout of the network as well as the respective calculations where the diameters of the PVC pipes were determined, calculation of work volumes and already in the design of the network we will use the free software EPANET 2.0, which allows us to know the pressures, velocities and flow rates that circulate through each node and proposed pipeline, achieving a gravity system. All the aforementioned procedures are governed by the Ecuadorian Standardization Institute, in the chapter on Drinking Water Supply System and the Ecuadorian Construction Standard. Finally, an environmental impact analysis was carried out, as well as a plan to reduce its effect, its respective analysis of unit prices and a valued work schedule that will show the construction stages of the project over time.
  • Item
    Elaboración de un manual técnico de especificaciones constructivas de un proyecto de captación y red de distribución de agua potable
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Carrera de Ingeniería Civil, 2017) Barrionuevo Tapia, Alejandro Javier; Acosta Lozada, Rodrigo Iván
    The present article is a summary of a technical manual of construction specifications for a catchment project and distribution network of drinking wáter, for the supply of vital liquid to communities located in rural areas with a beneficiary population of up to 10 000 inhabitants. The work is intended to serve as a guide for civil engineering professionals in charge of the execution of drinking water projects. With a focus on improving quality and health, the areas required for the execution of this type of infrastructure were established, based on the documentary review of projects carried out previously. At the same time, the estimated costs demanded the execution of the project were established. The study determined the general budget to carry out this kind of work is 1,714,404.11 USD, at 2017, considering that it is necessary to build work of capture, driving, tank ruptures pressure, reserve tank and distribution infrastructure. Among the most representative items are water meters, household connections, PVC pipes, machine excavation and compacted filling. In each of the items, the indirect costs were increased by 1%, a percentage that will be allocated for the job security of the workers involved in the execution of the work.
  • Item
    Diseño de un sistema de riego presurizado con filtros hidráulicos con retrolavado, en el sector Chusalongo perteneciente al cantón Tisaleo, provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Carrera de Ingeniería Civil, 2017) Mafla Medina, Edison David; Guevara Robalino, Jorge Javier
    The present project "Design of a pressurized irrigation system with hydraulic filters with flowback, in the Chusalongo sector belonging to cantón Tisaleo, province of Tungurahua", is focused on raising awareness in the agricultural community that the updating in new irrigation systems and other Alternatives are now more efficient, and with this can be achieved better production. In this research, the field work was done to the 183 people benefited by the irrigation system, bibliographical research was done in books and manuals for the implementation of irrigation, also was carried out the topographic survey of 94 hectares which helped the layout And design of the proposed system. As a proposal for this research, the design and implementation of the first stage of a Pressurized Irrigation System was carried out, containing aspects such as: Hydraulic Design of the entire distribution network of the System, in both Main and Secondary branches, totaling 19737m of pipe, to In turn design the necessary structures for the operation of the system; Such as 22 hydraulic pressure regulating valves, 27 control valves, 21 quick relief valves, 199 hydrants and as an important part a hydraulic filter with backwash.
  • Item
    Diseño de la red de distribución de agua potable de la parroquia El Rosario del cantón San Pedro de Pelileo, provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Carrera de Ingeniería Civil, 2016) Mena Céspedes, María José; Huacho Oleas, Jorge Andrés
  • Item
    Diseño de un sistema de potabilización para aguas subterráneas, y la red de distribución de agua potable en el caserío Tontapí Chico de la parroquia Los Andes, cantón Patate, provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Carrera de Ingeniería Civil, 2016) Rojano Chinachi, Walter Guillermo; Huacho Oleas, Jorge Andrés
  • Item
    Estudio y diseño para el mejoramiento del sistema de agua potable de la comunidad Escalera Loma, parroquia San José de Poaló, cantón Latacunga, provincia de Cotopaxi
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Carrera de Ingeniería Civil, 2016) Reinoso Arias, Héctor Michel; Morales Fiallos, Fabián Rodrigo
  • Item
    Diseño de la red de distribución del agua potable en la comunidad de Huapante Grande perteneciente a la parroquia de San Andrés, cantón Píllaro, provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Carrera de Ingeniería Civil, 2016) Tixe Granja, Hugo Daniel; Huacho Oleas, Jorge Andrés
  • Item
    Abastecimiento de agua potable y su incidencia en la condición sanitaria de los habitantes de la comunidad Shuyo Chico y San Pablo de la parroquia Angamarca, cantón Pujili, provincia de Cotopaxi
    (2015-07) Criollo Chango, Juan Carlos; Pazmiño Gavilánez, Segundo Francisco
    Los habitantes de la comunidad Shuyo Chico y San Pablo de la parroquia Angamarca, cantón Pujilí, provincia de Cotopaxi, no tienen un adecuado sistema de agua potable, ya que actualmente disponen de un servicio de agua en pésimas condiciones el cual proviene de pozos de agua que están contaminados con desechos fecales de animales. Se realiza el análisis de la condición actual del sistema de agua del cual disponen actualmente los habitantes, se considera que el sistema no cuenta con una planta de tratamiento adecuada y que en ocasiones consumen agua contaminada con microorganismos, por lo cual la alternativa que se plantea en este proyecto es de captar agua de la vertiente denominada “Culusi”, de acuerdo al análisis físico, químico y bacteriológico es viable por cuanto los resultados obtenidos están dentro de los parámetros permisibles para agua de consumo. El proyecto propuesto consta de una obra de captación, planta de tratamiento y la respectiva red de distribución. La obra de Captación estará diseñada con un caudal de 0,89 lt/seg. Mientras que el caudal de conducción estará diseñado con 1,22 lt / seg. La planta de tratamiento constará de una caseta de cloración con un equipo de hipoclorito con todos sus accesorios. El tanque de reserva de 40 m3 será de hormigón armado con tapa circular. La distribución se lo realizará mediante malla abierta ya que por el momento no existe una planificación de apertura de calles futuras y solo existe una vía principal.
  • Item
    El agua potable y su incidencia en la calidad sanitaria de los habitantes del barrio el progreso de la comunidad Puñachizag del cantón Quero, provincia de Tungurahua
    (2015-07) Collay Quicintuña, Nancy Etelvina; Morales Fiallos, Fabián Rodrigo
    Para la elaboración de este proyecto se realizaron encuestas de las cuales los habitantes manifestaron que actualmente cuentan con agua entubada, además dan a conocer las fallas de dicho sistema, esto minimiza la calidad sanitaria de los moradores. Debido a esto se llega a la conclusión de realizar una nueva distribución del sistema de abastecimiento de agua potable y la ampliación del tanque de almacenamiento del barrio El Progreso, para la realización de este proyecto se aplicaron normas establecidas por el INEN y el C.E.C. para proyectos de alcantarillado y agua potable, además se realizó el levantamiento topográfico, los cálculos para diseño de agua potable, los cálculos de caudales: caudal medio diario, caudal máximo diario, caudal máximo horario; el cálculo del volumen del tanque de reserva, la redistribución del sistema de abastecimiento de agua y la ampliación del tanque de reserva.