Ingeniería Civil y Mecánica
Permanent URI for this communityhttp://repositorio.uta.edu.ec/handle/123456789/898
Browse
4 results
Search Results
Item Diseño geométrico vial, del pavimento y las obras de arte de la vía Piedadcita- Estero Hondo desde la abscisa 0+000 hasta la abscisa 3+400 perteneciente al cantón Pangua, provincia de Cotopaxi(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2021-03) De La Cruz Remache, Wilson Fabian; Moreira Cedeño, Fricson LutgardoThe following technical research project was developed, in order to improve the mobility of the inhabitants of the sector as well as to improve the economic activity that this road represents. The recognition of the place was carried out, to later carry out the topographic survey of the road, and through the study of soils it was determined and identified each of the properties of the soil along the road, carrying out laboratory tests in which applied the different technical standards for its study, such as the ASSHTO method and the ASTM standard, since with the soil studies the design of the pavement structure is carried out. Vehicular traffic was counted to identify the type of road according to the number of vehicles that circulate on it based on the regulations of the Ministry of Public Works, thus allowing us to classify our road as type III. Finally, the analysis of unit prices was carried out, which together with the elaboration of a valued work schedule, it was possible to determine the referential budget and identify the execution time of the technical project.Item Diseño geométrico de la vía Nuevo Porvenir – El Guabo – La Lorenita – en el tramo km 8+000 – 12+000 perteneciente a la parroquia Moraspungo, cantón Pangua, provincia de Cotopaxi(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2020-10) Torres Bonilla, Erick Kenneth; Acosta Lozada, Rodrigo IvánThe main objective of this project is to carry out the geometric design of the road, to achieve socioeconomic development and improve the quality of life of the population of the sector. The project began with the inspection of the sector, as well as the topographic survey, being of great help the total station to obtain the geographical coordinates, elevation of the land, location of houses, sewers, bridges and various constructions surrounding the road . The properties and quality of the existing soil in the sector were identified, a vehicle count was carried out manually on a neighboring road because the existing traffic on the road is very scarce due to the conditions in which it is located, this contributed to the design geometry and the calculation of the pavement structure. Once the project is finished, it will be delivered to the Decentralized Autonomous Government of Moraspungo as a contribution from the Technical University of Ambato, for the community, who will be able to use it in the optimal way to carry out this work.Item Diseño geométrico de la alternativa vial Shuyo – Pinllopata en el tramo km 16 + 000 – 20 + 000 perteneciente a los cantones Pujilí y Pangua de la provincia de Cotopaxi(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2020) Yanzapanta Yanzapanta, Andrés Sebastián; Moreira Cedeño, Fricson LutgardoThis technical project has as main objetive to the design of four kilometers stretch of road located between the abscissas 16+000 – 20 + 000 of the existing roads that connects Shuyo and Pinllopata, belonging to the Cotopaxi province; directly influencing in the development of these populations and the quality of life of their habitants. This work begins by making a direct observation of the study site in order to determine the current conditions of the road and terrain , then the topographic study with wich we carry out the horizontal, vertical and transversal design of the road with their respective sections of road, volumes of soil movements, ditches and important points where the road will pass adjusting to the new design. In addition, the traffic study (TPDA) was carried out in a manual counting station located in the rural town Chisla with a duration of 7 days for a period of 12 consecutive hours, through which it was possible to determine the number oh vehicles that traveled through this route and the projected traffic in the future with the new route by means of the AASHTO method and the thirty hour. Finally, the cut and fill volume will be calculated, with which a unit price analysis and a work schedule will be carried out. Once this study is completed, it will be delivered to the Angamarca Parish GAD as a contribution from the Universidad Técnica de Ambato to the community so that the construction of the road infrastructure can be carried out, or used in the way it deems appropriate.Item Diseño geométrico de la alternativa vial Shuyo – Pinllopata en el tramo km 0 + 000 – 4 + 000 perteneciente a los cantones Pujilí y Pangua de la provincia de Cotopaxi(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2019) Jerez bunces, Fernando Javier; Aldás Sánchez, Milton RodrigoThe present technical project of beginning with the topographic survey, made with the total station, to determine the type of surface of the land in order to relate to the regulations and proceed with the layout. For the determination of vehicular volume, a method of manual counting was chosen during the 7 days of the week that took place from Monday, June 3, 2019 to Sunday, June 9, 2019 with a duration of 12 hours a day. The data obtained served to determine the Average Daily Traffic (TPDA) proceeding with the methods of the equivalent vehicle and the thirty hour. With the data obtained in the field, we proceeded with the geometric design of the road in a horizontal, vertical and transversal direction, taking into account the criteria and design standards in force in the Ecuadorian state. Once the geometric design was developed, we proceeded to obtain the mass volumes by means of the vertical design of the road, to later elaborate the referential budget of the section of the road under study. The aforementioned procedures are tabulated for easy interpretation and the geometric design is elaborated in properly georeferenced plans.