Ingeniería Mecánica
Permanent URI for this collectionhttp://repositorio.uta.edu.ec/handle/123456789/900
Browse
1 results
Search Results
Item Desarrollo de un plan de mantenimiento para la línea de producción de la empresa productora lácteos San José de la ciudad de Píllaro, basado en la metodología de mantenimiento productivo total (TPM)(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánica, 2023-01) Castro Pico, Jason Daniel; López Velástegui, Jorge EnriqueDue to the need to improve production, this project allowed the development of a plan based on the methodology of Total Productive Maintenance TPM for the company Productos Lácteos San José in the city of Píllaro, information was collected which was provided by management and staff working in the company who collaborated in the collection of technical data of the machines involved in the research. In the development of the project, a diagnosis of the current situation of the company was elaborated, then for the consolidation and development of the Total Productive Maintenance TPM were made: technical data sheets of the equipment, environmental and safety suggestions for the operators, machine weighting tables, inventory of equipment and machines, interviews for the collection of information, as well as training through information campaigns detailing the model of the plan to be implemented in the company, In addition, Excel spreadsheets of Failure Mode Analysis "FMEA", Criticality Matrix, global effectiveness analysis and ending with the elaboration of the Maintenance Ranges, a statistic according to the need of each equipment and the application of the 5 "S" within the company taking into consideration the criteria described with the participation of the personnel of each area were elaborated.