Ingeniería Mecánica
Permanent URI for this collectionhttp://repositorio.uta.edu.ec/handle/123456789/900
Browse
1 results
Search Results
Item Desarrollo e implementación de un plan de mantenimiento preventivo mediante el método TPM para el departamento de producción en la empresa carrocerías Impedsa(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánica, 2024-06) Arguello Miguez, Geovanny Adrian; Paredes Robalino, María BelénThis technical project was developed to implement a maintenance plan based on the total productive maintenance (TPM) methodology; to prolong the useful life of the components of the equipment and machines that are part of the production line, improving the organization of production in order to avoid unnecessary stoppages in the production lines. The information gathering was carried out, which consisted of carrying out an inventory of the machines and equipment to know the amount of equipment, the coding and the state in which they are found, then through the TPM, the “5S” was applied, selection of equipment and pilot machines for the respective maintenance aircraft; In addition, the failure modal analysis and effects matrix (FMEA) was carried out for each of the components, determining the possible failures of the equipment and the criticality analysis of the same, and with the maintenance ranges using specialized software that specializes in failure prevention activities taking into consideration the frequency and time to subsequently allow the objective of implementing the maintenance plan to be developed. As a result, the execution of an annual preventive maintenance plan was obtained with the activities that were organized for the various components, complying with the estimated times and operating frequency for one year; in addition to implementing a continuous improvement system with the TPM philosophy, involving both operators and maintenance personnel.